refergeni

Sollasweeo 2 . 0

mmdkenldla · 2026-08-05 · Source naver

Sollasweeo 2.0 is a service that leases the roofs of factories, logistics warehouses, and industrial complex building owners to reduce initial cost burdens and help generate profits and reduce electricity bills through solar power generation.

See the full business overview →산업단지 태양광 임대, 공장 지붕 태양광 임대로 초기 비용 부담을 줄이는 솔라쉐어2.0
Sourcemmdkenldla · blog.naver.com/mmdkenldla
Published2026-08-05
OriginalView original →

Key information

Example of 5-year prepaid rent by pyeong300 pyeong (150kW): 60 million KRW in the first year, total profit 150 million KRW; 500 pyeong (250kW): 100 million KRW in the first year, total profit 250 million KRW; 1,000 pyeong (500kW): 200 million KRW in the first year, total profit 500 million KRW; 2,000 pyeong (1,000kW): 400 million KRW in the first year, total profit 1 billion KRW
SolarOnCareA service that manages about 5,000 power plants nationwide 24 hours a day with AI from a central control center and checks for abnormalities
contract period20-year long-term business
factors affecting installation capacity fluctuationInstallation capacity and profits may vary depending on roof structure, condition, and shading

Frequently asked questions

Q. How does solar leasing for industrial complexes proceed?

Sollasweeo 2.0 leases roofs from building owners of factories, logistics warehouses, and industrial complexes. It installs solar power generation without initial cost burden, enabling electricity bill reduction and rental income.

Q. What are the examples of rent by size for Sollasweeo 2.0?

For Sollasweeo 2.0, examples of 5-year prepaid rent by size are: 300 pyeong (150kW) with 60 million KRW for the first year and total profit of 150 million KRW; 500 pyeong (250kW) with 100 million KRW for the first year and total profit of 250 million KRW.

Q. How is maintenance handled when leasing a factory roof for solar power?

Sollasweeo 2.0 uses SolarOnCare to manage approximately 5,000 power plants nationwide 24/7 with AI, checking for abnormalities, thus systematically supporting maintenance of factory roof solar leasing facilities.

Q. Is solar leasing possible even if the factory roof has leaks or requires waterproofing work?

Sollasweeo 2.0 informs that even when there are roof leaks or waterproofing construction burdens, roof utilization and renewable energy projects can be reviewed together.

View original →

Related posts

Riyupillateseu Dongnamjeom
naver · mmdkenldla